ESO — Chromatic Zoning & Open Framework - rimini 2022

The Intervention:
Engineering and manufacturing the client's concept for t ESO space at Ecomondo. AVNTGARD acted as the core execution partner, realizing a completely open, that relied entirely on multi-colored graphic synchronization across both floor and wall planes to define the layout.

Technical & Production Execution:
Open Framework: Constructed a completely open, minimaliststructural skeleton, eliminating physical barriers to maximize visitor transit and spatial transparency.
Two-Dimensional Chromatic Zoning: Executed high-precision graphic applications in various contrasting colors that transitioned seamlessly from the walls down to the floor, architecturally dividing the different brand areas without the use of walls or partitions.